Skip navigation
More Options
A-
A+
{1}
##LOC[OK]##
MENU
How Do I
Apply For
Contractor Prequalification
Development Applications
Employment
Licenses
Park Rentals
Permit Applications
Pay
Fire Department
General Billing
Parking Citations
Police Record Request
Property Tax
Right of Way Permit
Traffic/Ordinance Citations
Utility Bills
Register
Adopt-a-Road
Contractor Prequalification
Email Newsletter
Emergency Alerts
Recreation Classes and Programs
To Vote
Village Calendar and Resource Directory
Report
Animal Problem
Crime or Suspicious Activity
Streetlight Outage
Weed Complaint
Ordinance Violation
Request
Diggers Hotline
Public Records
View
Budget and Finance Information
Garbage and Recycling Schedules
How To Video Gallery
Leaf Collection Schedule
News
Property Tax FAQ
Public Notices
Social Media
Village Newsletter
Residents
Community Organizations
Community Resources
Friends of Pleasant Prairie Parks
Pleasant Prairie Historical Society
Pleasant Prairie Woman's Club
Police Officer Appreciation Association
Public Library
Get Involved
Adopt-a-Road
Boards and Commissions
Public Meetings
Volunteer
Have Fun
Beaches and Boating
Bicycle and Pedestrian Trails
Events
Parks
Photo Contest
Pleasant Prairie RecPlex
Safety
Crime Prevention
Emergency Preparedness
Fire Prevention
Neighborhood Watch
Nixle
RecPlex Emergency Shelter
Schools
RecPlex Childcare and Pre-school
Kenosha Unified School District
Universities/Colleges/Technical Colleges
Transportation
Airports
Kenosha County Transportation
Train Stations
Your Home
Diggers Hotline
Disposing of Household Items
Garage/Rummage Sales
Garbage and Recycling
Property Tax FAQ
Security Tips
Utility Emergency
Vacation Checks
Welcome to Pleasant Prairie
Business
Community Plans and Reports
2035 Comprehensive Plan
2035 Land Use Plan Map
Bicycle and Pedestrian Trails Plan
Neighborhood Plans
Park and Open Space Plan
New Housing Fee Report
Housing Affordability Report
Economic Development
Featured Development Sites
Construction and Permits
Community Partners
Maps and Drawings
Village Stats
Visitors
Visitor Information
Bicycle and Pedestrian Trails
Climate
Getting Around
History
Hunting
Natural and Open Spaces
Parks and Beaches
RecPlex
Triathlons
Veterans Memorial
Convention & Visitors Bureau
Events
Hotels
Restaurants
Things To Do
Services
Animals and Pets
Animal Problem
Dog Licenses
Dog Park
Construction and Development
Community Plans
Construction and Development
Elections and Voting
Environmental
Clean Water Utility
Holiday Tree Drop-Off
Root Pike Watershed Initiative
Weed Complaints
Beach Sample Results
Garbage and Recycling
Brush Collection
Bulk Items/White Goods
Electronics Recycling
Garbage Collection
Hazardous Waste Collection
Leaf Collection
Medication Collection
Recycling Collection
Residential Recycling Center
Shred Events
Smoke/Carbon Monoxide Detectors
Textile/Clothing Collection
Information
Cable Channel
Emergency Alerts
Meetings and Notices
Open Village Hall
Property Tax FAQ
Public Records
Referendum
Village Newsletter
Parks and Recreation
Bicycle and Pedestrian Trails Plan
Memorial Bench Orders
Memorial Brick Orders
Memorial Tree Planting
Park and Open Space Plan
Parks, Beaches and Natural Areas
Park Rentals
Sledding Hill
Sports and Fitness
Therapeutic Recreation
Veterans Memorial
Streets
Adopt-a-Road
Drainage Culverts and Ditches
Residential Street Lights
Road Maintenance
Snow Plowing
Utilities
Diggers Hotline
Sewer and Water Utilities
Stormwater/Clean Water Utility
Utility Bills
Departments
Administration
Assessment Services
Assessment FAQ
Assessment Process
Board of Review Hearings
Helpful Links
Building Inspection
Permits
Community Development
Community Plans
Comprehensive Plan 2050 Update
Development Applications
Permits
Floodplain-Coastal Areas Along Lake Michigan
Engineering
Chapter 405 Design Standards and Construction Specifications 2023
Engineering Contacts
Permits
Village Standard Details
Finance
Pay Online
Property Tax Information
Utility Bill
2024 Adopted Budget Book
Fire & Rescue
Stations
News
Personnel
EMS
HazMat
Technical Rescue
Commercial
Residential
Park Safety Improvements
Frequently Asked Questions
Contact Us
Employment
History
Informational Videos
Public Safety Sites
Human Resources
Employment
Employee Self Service
Employee Recognition
Village Values
Information Technology
Municipal Court
Contact Us
FAQs
Helpful Links
Online Court Services
Paying a Citation
Parks
Police
About PPPD
Bicycle Lanes
CARFAX Reports
Citizen Complaint Policy
Community Camera Partnership
Contact Us
Crime Prevention
Department History
Employment
Internet Resources
Investigations Bureau
Medication Collection
Mission Statement
News
Patrol Bureau
Pay Parking Citation
Pleasant Prairie Police Department Annual Reports
Police Records Bureau
Public Safety Communication
Retail Theft Reporting
Social Media Terms of Use for the Public
Vacation Checks
Public Works
Contact Us
Electronics Recycling
Garbage Recycling & Hazardous Waste
Holiday Tree Drop-Off
Leaf Collection
Residential Recycling Center
Residential Street Lights
Right of Way
Road Maintenance
Snow Plowing
Recreation
Sewer and Water Utilities
Clean Water Utility
Contact Us
Diggers Hotline
Groundwater Infiltration
Lead FAQs
Plumbing Tips
Resource Links
Seasonal Tips
Utility Bill Rates
Water Quality Report
Well Water
Utility Bill
Fire Hydrant Flow Tests
LCRR Service Line Inventory
Village Clerk
Boards and Commissions
Elected Officials
Elections and Voting
Election Notices
Laws & Policies
Licenses
Permits
Public Notices
Public Records Request
Government
Boards and Commissions
Village Board
Board of Review
Community Development Authority
Park Commission
Plan Commission
Police and Fire Commission
Sex Offender Residence Board
Zoning Board of Appeals
Boards and Commissions Member Information
Budget Book
Elected Officials
Municipal Judge
Village Board
History
Pleasant Prairie Historical Society
Laws and Policies
Local Ordinances
Wisconsin State Statutes
Meetings and Notices
New Resident
How Do I
Apply For
Contractor Prequalification
Development Applications
Employment
Licenses
Business License
Cigarette and Tobacco Products Retail License
Contractor Licenses
Dog License
Alcohol Beverage License
Peddlers, Canvassers, Solicitors and Transient Merchant License
Secondhand Article and/or Jewelry Dealers License
Operator (Bartender) License
Commercial Quadricycle
Park Rentals
Permit Applications
Commercial Permits
Diggers Hotline
Multi-Family Residential Permits
Sign Permits
Single Family/Two Family Residential Permits
Temporary Use Permits
Permit Fees
Block Party Permit
Pay
Fire Department
General Billing
Parking Citations
Police Record Request
Property Tax
Right of Way Permit
Traffic/Ordinance Citations
Utility Bills
Register
Adopt-a-Road
Contractor Prequalification
Email Newsletter
Emergency Alerts
Recreation Classes and Programs
To Vote
Village Calendar and Resource Directory
Report
Animal Problem
Crime or Suspicious Activity
Streetlight Outage
Weed Complaint
Ordinance Violation
Request
Diggers Hotline
Public Records
View
Budget and Finance Information
Garbage and Recycling Schedules
How To Video Gallery
Leaf Collection Schedule
News
Property Tax FAQ
Public Notices
Social Media
Village Newsletter
Residents
Community Organizations
Community Resources
Kenosha Achievement Center
Kenosha Area Family and Aging Services
Kenosha County Emergency Management
Kenosha Human Development Services
Friends of Pleasant Prairie Parks
Pleasant Prairie Historical Society
Pleasant Prairie Woman's Club
Police Officer Appreciation Association
Public Library
Get Involved
Adopt-a-Road
Boards and Commissions
Public Meetings
Volunteer
Have Fun
Beaches and Boating
Bicycle and Pedestrian Trails
Events
Parks
Photo Contest
Pleasant Prairie RecPlex
Safety
Crime Prevention
Emergency Preparedness
Fire Prevention
Neighborhood Watch
Nixle
RecPlex Emergency Shelter
Schools
RecPlex Childcare and Pre-school
Kenosha Unified School District
Universities/Colleges/Technical Colleges
Transportation
Airports
Kenosha County Transportation
Train Stations
Your Home
Diggers Hotline
Disposing of Household Items
Garage/Rummage Sales
Garbage and Recycling
Property Tax FAQ
Security Tips
Identity Theft
Oops Card
Utility Emergency
Vacation Checks
Welcome to Pleasant Prairie
Business
Community Plans and Reports
2035 Comprehensive Plan
2035 Land Use Plan Map
Bicycle and Pedestrian Trails Plan
Neighborhood Plans
Park and Open Space Plan
New Housing Fee Report
Housing Affordability Report
Economic Development
Featured Development Sites
Construction and Permits
Design Standards/Construction Specifications
Development Applications
License
Permits
Village Ordinances
Community Partners
Maps and Drawings
Village Stats
Visitors
Visitor Information
Bicycle and Pedestrian Trails
Climate
Getting Around
History
Hunting
Natural and Open Spaces
Parks and Beaches
Beaches
Dog Park
Frisbee Disc Golf
Ice Safety
Lake Michigan Parklands
Natural Areas
Prairie Springs Park History
Sledding Hill
RecPlex
Triathlons
Veterans Memorial
Convention & Visitors Bureau
Events
Hotels
Restaurants
Things To Do
Services
Animals and Pets
Animal Problem
Dog Licenses
Dog Park
Construction and Development
Community Plans
Construction and Development
Elections and Voting
Environmental
Clean Water Utility
Pleasant Prairie Clean Water Utility FAQ's
Clean Water Utility Budget Presentation
Holiday Tree Drop-Off
Root Pike Watershed Initiative
Weed Complaints
Beach Sample Results
Beach Sample Results 2023
Beach Sample Results 2022
Beach Sample Results 2021
Beach Sample Results 2020
Garbage and Recycling
Brush Collection
Bulk Items/White Goods
Electronics Recycling
Garbage Collection
Hazardous Waste Collection
Leaf Collection
Medication Collection
Recycling Collection
Residential Recycling Center
Shred Events
Smoke/Carbon Monoxide Detectors
Textile/Clothing Collection
Information
Cable Channel
Emergency Alerts
Meetings and Notices
Public Notices
Open Village Hall
Property Tax FAQ
Public Records
Referendum
Referendum FAQ
Village Newsletter
2023 Village Newsletters
2022 Village Newsletters
2021 Village Newsletters
2020 Village Newsletters
2019 Village Newsletters
2018 Village Newsletters
2017 Village Newsletters
Parks and Recreation
Bicycle and Pedestrian Trails Plan
Memorial Bench Orders
Memorial Brick Orders
Memorial Tree Planting
Park and Open Space Plan
Parks, Beaches and Natural Areas
Park Rentals
Sledding Hill
Sports and Fitness
Therapeutic Recreation
Veterans Memorial
Streets
Adopt-a-Road
Drainage Culverts and Ditches
Residential Street Lights
Road Maintenance
Snow Plowing
Utilities
Diggers Hotline
Sewer and Water Utilities
Stormwater/Clean Water Utility
Utility Bills
Drips Waste Dollars
Utility Bill Rates
Departments
Administration
Assessment Services
Assessment FAQ
Assessment Process
Valuing Property
Why Values Change
Assessed Values and the Tax Rate
Differing with Assessed Value
Reviews
Conclusion
Board of Review Hearings
Helpful Links
Building Inspection
Permits
Community Development
Community Plans
Comprehensive Plan 2050 Update
Comprehensive Plan FAQ
Development Applications
Permits
Floodplain-Coastal Areas Along Lake Michigan
Engineering
Chapter 405 Design Standards and Construction Specifications 2023
Engineering Contacts
Permits
Village Standard Details
Finance
Pay Online
Property Tax Information
Utility Bill
2024 Adopted Budget Book
Fire & Rescue
Stations
News
Personnel
EMS
HazMat
Technical Rescue
Commercial
For Contractors
Fire Inspections
Residential
Park Safety Improvements
Frequently Asked Questions
Contact Us
Employment
History
Informational Videos
Public Safety Sites
RSI Drug Tables
Human Resources
Employment
Apply for Open Positions
Employee Self Service
ESS Instructions
Pleasant Prairie Employee Self Service
Employee Recognition
Village Values
Information Technology
Municipal Court
Contact Us
FAQs
Helpful Links
Wisconsin Statutes
Pleasant Prairie Ordinances
Online Court Services
Paying a Citation
Parks
Police
About PPPD
Bicycle Lanes
CARFAX Reports
Collision Reports
Citizen Complaint Policy
Community Camera Partnership
Contact Us
Crime Prevention
Department History
Employment
Internet Resources
Investigations Bureau
Medication Collection
Mission Statement
News
Police and Fire & Rescue News Releases
Police and Fire & Rescue News Archive
Patrol Bureau
Pay Parking Citation
Paying a Parking Ticket
Paying a Traffic/Ordinance Citation
Pleasant Prairie Police Department Annual Reports
Police Records Bureau
Public Safety Communication
Retail Theft Reporting
Social Media Terms of Use for the Public
Vacation Checks
Public Works
Contact Us
Electronics Recycling
Garbage Recycling & Hazardous Waste
Holiday Tree Drop-Off
Leaf Collection
Residential Recycling Center
Residential Street Lights
Right of Way
Road Maintenance
Snow Plowing
Recreation
Sewer and Water Utilities
Clean Water Utility
Contact Us
Diggers Hotline
Groundwater Infiltration
Lead FAQs
Plumbing Tips
Resource Links
Seasonal Tips
Utility Bill Rates
Water Quality Report
Well Water
Utility Bill
Fire Hydrant Flow Tests
LCRR Service Line Inventory
Village Clerk
Boards and Commissions
Elected Officials
Elections and Voting
Election Notices
2024
Laws & Policies
Licenses
Permits
Public Notices
Public Records Request
Government
Boards and Commissions
Village Board
Meeting Information
Speaking at Board Meetings
Board Members
Board Members Contact Information
Board of Review
Board of Review Notices
Meeting Information
Members
Community Development Authority
Meeting Information
CDA Meeting Archives
Members
Park Commission
Meeting Information
Park Commission Meeting Archives
Members
Plan Commission
Meeting Information
Plan Commission Meeting Archives
Members
Police and Fire Commission
Meeting Information
Members
Sex Offender Residence Board
Meeting Information
Sex Offender Residence Board Meeting Archives
Members
Zoning Board of Appeals
Meeting Information
Zoning Board of Appeals Meeting Archives
Members
Boards and Commissions Member Information
Budget Book
Elected Officials
Municipal Judge
Village Board
History
Pleasant Prairie Historical Society
Laws and Policies
Local Ordinances
Wisconsin State Statutes
Meetings and Notices
New Resident
Skip Sidebar Navigation
HWY 50 Expansion Project
Twelfth Night Ceremony
2023 Fleet Budget & Solid Waste Collection
2023 Triathlons at RecPlex
Forensic Video Examiner Certification
Village Newsletter January/February 2023
Development Agreement
Koessl Court
Food and Beverage Concessions
Buona Beef and Rainbow Cone
County Hazardous Waste Collection 2023
Partnership Agreement
Snow Emergency Declared
2023 Polling Locations
Feeding Wildlife Reminder
Unsolicited Water Quality Testing Mailings
Snow Emergency
Fix a Leak Week
Spring Shred Event
Village Offices Closed on Good Friday
Enhanced Bicycle Lane Safety Measures in Place
Fred Astaire Dance Studio Plans
HWY 50 Expansion Project
Tax Incremental District No. 10
RecPlex Kids & Family Expo
Snow Emergency in Pleasant Prairie
RecPlex Concessions Agreement
Intergovernmental Mutual Aid Agreement
Spring Election Polling Locations
2023 Paving Projects
Home2 Suites Hotel Development
Olds Products Plans Four Phase Expansion
LMI Packaging Facility Expansion
Bicycle Rodeo
Professional Opportunities in Recreation
2023 Water Quality Report
Memorial Day Hours
Independence Day Hours
Lake Andrea Beach Summer Season
Wisconsin Marathon
Pleasant Prairie Photo Contest
Highland Estates Subdivision
Strength and Conditioning Rooms
Cedar Ridge Conceptual Plan
Lake Andrea Beer Garden
New Traffic Pattern
All Saints Cemetery Mausoleum Addition
Pleasant Prairie Triathlon
Milling and Paving Operations
Fastest Man Woman in Kenosha
Fall Shred Event
Sheridan Road to Close Long Term
Request for Proposal
Community Grocery Giveaway
National Night Out
ICMA Credentialed Manager Eric Rindfleisch
Park and Open Space Survey
Wisconsin Women’s Triathlon Road Closures
Labor Day Hours
Highland Estates Zoning Amendments
Photo Contest Winners
Village Calendar and Resource Directory
Public Invited to Safety Day in the Prairie
Tank of the Year Nomination
Cafe Zupas
Shell Gasoline Facility
Trick-or-Treat
Veterans Day Ceremony
32nd Avenue Road Closure
Village Newsletter September/October 2023
Creekside Crossing Public Street Dedications
The Summit at Bain Station
RecPlex Living Well Scholarship
Scary in the Prairie 5K
Cooper Road Basin Agreement
Community Development Director Plans Retirement
2024 Proposed Budget
RecPlex and Lululemon Outlet Store Partner
2023 Run with the Turkeys 5K
Meeting Notices
Engineering Department Moves to New Location
Consider Joining a Board or Commission
New Meeting Times
18th Annual Shop With a Cop and Firefighter Event
Thanksgiving Holiday Hours
Holiday Hours
Village Newsletter November/December 2023
Extended Leaf Collection
Free Community Fitness Class Day
2023 Property Tax Insert
2024 General Government Budgets
2023 Winter Extravaganza and Holiday Skate
Twelfth Night Holiday Tree Bonfire
Holiday Tree Drop-Off Sites
Reminder Twelfth Night Holiday Tree Bonfire
2024 Village Calendar and Resource Directory
Requesting Cooperating Agency Status
Pleasant Prairie Snow Emergency
Last item for navigation
Skip Sidebar Navigation
HWY 50 Expansion Project
Twelfth Night Ceremony
2023 Fleet Budget & Solid Waste Collection
2023 Triathlons at RecPlex
Forensic Video Examiner Certification
Village Newsletter January/February 2023
Development Agreement
Koessl Court
Food and Beverage Concessions
Buona Beef and Rainbow Cone
County Hazardous Waste Collection 2023
Partnership Agreement
Snow Emergency Declared
2023 Polling Locations
Feeding Wildlife Reminder
Unsolicited Water Quality Testing Mailings
Snow Emergency
Fix a Leak Week
Spring Shred Event
Village Offices Closed on Good Friday
Enhanced Bicycle Lane Safety Measures in Place
Fred Astaire Dance Studio Plans
HWY 50 Expansion Project
Tax Incremental District No. 10
RecPlex Kids & Family Expo
Snow Emergency in Pleasant Prairie
RecPlex Concessions Agreement
Intergovernmental Mutual Aid Agreement
Spring Election Polling Locations
2023 Paving Projects
Home2 Suites Hotel Development
Olds Products Plans Four Phase Expansion
LMI Packaging Facility Expansion
Bicycle Rodeo
Professional Opportunities in Recreation
2023 Water Quality Report
Memorial Day Hours
Independence Day Hours
Lake Andrea Beach Summer Season
Wisconsin Marathon
Pleasant Prairie Photo Contest
Highland Estates Subdivision
Strength and Conditioning Rooms
Cedar Ridge Conceptual Plan
Lake Andrea Beer Garden
New Traffic Pattern
All Saints Cemetery Mausoleum Addition
Pleasant Prairie Triathlon
Milling and Paving Operations
Fastest Man Woman in Kenosha
Fall Shred Event
Sheridan Road to Close Long Term
Request for Proposal
Community Grocery Giveaway
National Night Out
ICMA Credentialed Manager Eric Rindfleisch
Park and Open Space Survey
Wisconsin Women’s Triathlon Road Closures
Labor Day Hours
Highland Estates Zoning Amendments
Photo Contest Winners
Village Calendar and Resource Directory
Public Invited to Safety Day in the Prairie
Tank of the Year Nomination
Cafe Zupas
Shell Gasoline Facility
Trick-or-Treat
Veterans Day Ceremony
32nd Avenue Road Closure
Village Newsletter September/October 2023
Creekside Crossing Public Street Dedications
The Summit at Bain Station
RecPlex Living Well Scholarship
Scary in the Prairie 5K
Cooper Road Basin Agreement
Community Development Director Plans Retirement
2024 Proposed Budget
RecPlex and Lululemon Outlet Store Partner
2023 Run with the Turkeys 5K
Meeting Notices
Engineering Department Moves to New Location
Consider Joining a Board or Commission
New Meeting Times
18th Annual Shop With a Cop and Firefighter Event
Thanksgiving Holiday Hours
Holiday Hours
Village Newsletter November/December 2023
Extended Leaf Collection
Free Community Fitness Class Day
2023 Property Tax Insert
2024 General Government Budgets
2023 Winter Extravaganza and Holiday Skate
Twelfth Night Holiday Tree Bonfire
Holiday Tree Drop-Off Sites
Reminder Twelfth Night Holiday Tree Bonfire
2024 Village Calendar and Resource Directory
Requesting Cooperating Agency Status
Pleasant Prairie Snow Emergency
Last item for navigation
Village of Pleasant Prairie
»
News
»
2023 News
»
HWY 50 Expansion Project
A-
A+
HWY 50 Expansion Project
HWY 50 Expansion Project
Posted on 07/25/2023
Information on behalf of Wisconsin Department of Transportation.
State Trunk Highway 50 is a major east-west route serving Kenosha County communities. This project consists of reconstructing 4.4 miles of WIS 50, from 117th Avenue in Pleasant Prairie to just west of 43rd Avenue in Kenosha.
The project includes:
- Widening the roadway from four to six lanes between 117th and 57th avenues (3.6 miles).
- Reconstructing the existing four-lane road between 57th and 43rd avenues (0.8 miles).
- Implementing access management measures, including driveway and median modifications.
- Providing more capacity at local road intersections.
- Improving access road connections.
- Adding sidewalk and bicycle accommodations throughout.
The proposed HWY 50 corridor improvements are needed to address:
- Mobility, safety, and access need.
- Insufficient mainline lane capacity.
- Deteriorating pavement and bridge structures.
- Substandard mainline and intersection geometrics.
- Oversized/overweight (OSOW) truck route.
- Major commercial corridor.
This project is slated to start in spring 2021 and be completed in 2023.
More information about the HWY 50 expansion can be found on the WisDOT website
here.
WisDOT HWY 50 News Release, January 29, 2021
WisDOT HWY 50 January Postcard Mailer
WIS 50 Project Completion
The Wisconsin Department of Transportation (WisDOT) has substantially completed the reconstruction of WIS 50(75th Street) between 117th and 43rd avenues in Kenosha County. The four mile project began in 2021 with the goals of increasing safety and access throughout the corridor, easing traffic in high-density areas, and improving the transportability of goods and freight. Minor work remains to be finalized throughout the summer.
WIS 50 Project Completion Summary PDF
60th Avenue 5-Hour Full Closure
Tuesday, June 6:
60th Avenue south of WIS 50 is scheduled to close to traffic between 2 a.m. and 7 a.m. while crews work to complete asphalt paving.
Alternate Route:
WisDOT encourages traffic to use WIS 50 (75th Street), WIS 31 (Green Bay Road), 85th Street and 60th Avenue to get around the closure.
60th Avenue 5-Hour Full Closure PDF
45th Avenue to Close
Beginning Monday, June 5:
45th Avenue south of WIS 50 will close to traffic for approximately 1 week while crews work to reconstruct
the roadway.
Alternate Route: WisDOT encourages local traffic to use 47th Avenue and 76th Street to get around this closure.
45th Avenue to Close PDF
Eastbound Traffic Switch on WIS 50 at 52nd Avenue
Beginning Friday, May 5:
• Eastbound traffic on WIS 50 (75th Street) is scheduled to be shifted to the newly paved eastbound lanes between 52nd Avenue and Pershing Boulevard.
• One lane of traffic will be maintained for eastbound travel.
• 47th Avenue is scheduled to reopen to traffic.
• 49th Avenue will have access only to eastbound WIS 50.
Alternate Route: WisDOT encourages local traffic to use 76th Street and 47th Avenue to access westbound WIS 50 from 49th Avenue.
Eastbound Traffic Switch on WIS 50 at 52nd Avenue PDF
WIS 50 Eastbound Ramps to Close at 77th Avenue
Beginning Wednesday, May 3:
• The eastbound ramps at 77th Avenue from WIS 50 are scheduled to close for approximately one week while crews perform various roadwork activities.
Alternate Route: Motorists are encouraged to use 88th Avenue (CTH H), 60th Street, Green Bay Road (WIS 31) and the 77th Avenue westbound ramps to get around this closure.
WIS 50 Eastbound Ramps to Close at 77th Avenue PDF
Median Closure on WIS 50 at 57th Avenue
Thursday, April 20:
• There will be a full median closure on WIS 50 at 57th Avenue lasting approximately through the end of April while crews reconstruct the median and turn lane.
• Eastbound traffic will not be able to turn left onto 57th Avenue.
Alternate Route: Eastbound motorists are encouraged to use 60th Avenue and 67th Street to get around this closure.
Median Closure on WIS 50 at 57th Avenue
Median Closure on WIS 50 at 73rd Avenue
Monday, April 10:
• There will be a full median closure on WIS 50 at 73rd Avenue for approximately two weeks while crews reconstruct the median and turn lane. Eastbound traffic will not be able to turn left onto 73rd Avenue.
• Eastbound traffic is encouraged to use 70th Avenue and 74th Place to access 73rd Avenue.
Median Closure on WIS 50 at 73rd Avenue PDF
52nd Avenue Scheduled to Close
Beginning Wednesday, March 8:
• 52nd Avenue, from WIS 50 to north of Harrison Road, is scheduled to close to traffic beginning March 8th through late spring while crews reconstruct the roadway.
Alternate Route: Motorists are encouraged to use WIS 50 (75th Street), 60th Avenue and 67th Street to get around this closure.
Access to businesses and residences will be maintained throughout construction.
52nd Avenue Scheduled to Close PDF
HWY 50 Project Overview
February 27, 2023:
The Wisconsin Department of Transportation is continuing with reconstructing WIS 50 (75th Street) between 117th and 43rd avenues in Kenosha County. Work began in early February 2021, with a scheduled completion of late summer 2023.
Work Completed in 2022:
•
Reconstructed westbound bridges over 77th Avenue, Canadian Pacific and Union Pacific railroads.
•
Constructed eastbound lanes between 70th and 52nd avenues
•
Constructed westbound lanes between 88th and 43rd avenues
•
Constructed stormwater retention pond and retaining wall at WIS 31/WIS 50 intersection
Continuing Traffic Impacts:
• WIS 50 will have one lane open in each direction from 60th Avenue to 43rd Avenue through early summer 2023
• WIS 50 will have two lanes open in each direction from 88th Avenue to 60th Avenue
• WIS 31 will have two lanes open in each direction through early summer 2023
• Sidewalks will be closed through early summer 2023
• Various side roads from WIS 31 to 43rd Avenue will remain under construction through early summer 2023
• 52nd Avenue north of WIS 50 will close from spring until late summer 2023
Work Expected in 2023:
• Construction of eastbound lanes from 52nd to 43rd avenue
• Construction of WIS 50 medians east of 73rd Avenue to 43rd Avenue and along WIS 31
• Complete expansion of WIS 50 to a six-lane roadway from 88th to 57th avenue
• Complete reconstruction of WIS 50 four-lane roadway from 57th to 43rd avenue
• Intersection improvements at WIS 31, 70th Avenue, 60th Avenue and 52nd Avenue
Overview PDF
45TH Avenue to Open, 47TH
Avenue
to Close
Monday, December 12:
• 45th Avenue just south of WIS 50 is scheduled to reopen to traffic.
• 47th Avenue just south of WIS 50 is scheduled to close to traffic while crews work to reconstruct the intersection.
These traffic patterns will remain in effect until spring 2023.
Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project are scheduled to close to traffic while intersections are under construction.
45TH Avenue to Open, 47TH Avenue to Close PDF
Traffic Switches on WIS 50 and WIS 31
Thursday, December 8:
• Westbound traffic on WIS 50 (75th Street) between 49th Avenue and 52nd Avenue is scheduled to be shifted to the newly paved westbound lanes.
• 52nd Avenue, north of WIS 50, is scheduled to open to traffic with right-in, right-out access only.
Friday, December 9:
• Southbound traffic on WIS 31 (Green Bay Road) from 78th Street to 67th Street is scheduled to be shifted to the newly constructed southbound lanes.
These traffic patterns will remain in effect until spring 2023.
Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project are scheduled to close to traffic while intersections are under construction.
Traffic Switches on WIS 50 and WIS 31 PDF
WIS 50 Eastbound Daytime Lane Reduction
Wednesday, November 30:
• Traffic on eastbound WIS 50 (75th Street), between 88th (County H) and 73rd avenues, is scheduled to be reduced to one lane from 7 a.m. to 5 p.m., while crews perform bridge work.
WIS 50 Eastbound Daytime Lane Reduction PDF
Northbound 60th Avenue Traffic Switch
Monday, November 28:
•
Traffic on northbound 60th Avenue from just north and south of WIS 50 (75th Street) is scheduled to be shifted to the west, onto the newly paved southbound lanes, while crews work to pave the WIS 50 and 60th Avenue intersection.
Bi-directional traffic on 60th Avenue will be maintained throughout construction. Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project area are scheduled to close to traffic while intersections are under construction.
Northbound 60th Avenue Traffic Switch PDF
WIS 50 Eastbound Lane Reduction and 77th Avenue Eastbound Ramps Daytime Closure
Tuesday, November 22:
• 77th Avenue eastbound ramps, are scheduled to close to traffic on Tuesday, November 22 between 7 a.m. and 5 p.m., while crews work to perform bridge work.
• Traffic on eastbound WIS 50 is scheduled to be reduced to one lane from 88th Avenue (County H)to 73rd Avenue.
Alternate Route:
Motorists are encouraged to use the 77th Avenue westbound ramps, 75th Street (WIS 50),88th Avenue (County H), 60th Street (County K)and Green Bay Road (WIS 31) to get around the closure.
WIS 50 Eastbound Lane Reduction and 77th Avenue Eastbound Ramps Daytime Closure PDF
Southbound WIS 31 (Green Bay Road) Traffic Switch
Friday, November 18:
• Traffic on southbound WIS 31 (Green Bay Road), from just north of 74th Street to 76th Street is scheduled to be shifted east, onto the median lanes, while crews work to place pavement at the intersection of WIS 50 and WIS 31.
Bi-directional traffic on WIS 31 (Green Bay Road) will be maintained throughout construction. Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project are scheduled to close to traffic while intersections are under construction.
Southbound WIS 31 (Green Bay Road) Traffic Switch PDF
70th Avenue to Reopen, 69th Avenue to Close
Wednesday, November 9:
• 70th Avenue, between WIS 50 (75th Street) and just north of 78th Street, is scheduled to reopen to traffic on Wednesday, November 9 by 8 p.m.
• 69th Avenue, between WIS 50 (75th Street) and 75th Place, is scheduled to close to traffic on Wednesday, November 9 by 11:59 p.m., through late 2022.
70th Avenue to Reopen, 69th Avenue to Close PDF
47th Avenue to Close Overnight
Monday, November 7:
• 47th Avenue, between WIS 50 (75th Street) and just north 76th Street is scheduled to close to traffic from 9 p.m. to 6 a.m., while crews work to install a storm sewer crossing.
Businesses and residents should also be aware that there will be noise and dust associated with this work,
steps will be taken to minimize these effects.
Alternate Route:
Motorists are encouraged to utilize WIS 50 (75th Street), 49th Avenue, and 76th Street to get around the overnight closure.
47th Avenue to Close Overnight PDF
WIS 31 (Green Bay Road) Traffic Switch
Friday, November 4:
• Traffic on northbound WIS 31 (Green Bay Road), from 78th Street to 67th Street is scheduled to be shifted east, onto the newly constructed northbound lanes beginning Friday, November 4.
• 74th Street east of WIS 31 is scheduled to reopen to traffic.
Bi-directional traffic on WIS 31 (Green Bay Road) will be maintained throughout construction. Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project are scheduled to close to traffic while intersections are under construction.
WIS 31 (Green Bay Road) Traffic Switch PDF
Daytime Full Closure of 77th Avenue Westbound Ramps
Wednesday, October 26:
• 77th Avenue westbound ramps, are scheduled to close to traffic Wednesday, October 26 from noon to 5 p.m., while crews work to perform asphalt paving.
•As part of a separate project, County Highway K(60th Street), between 94th Court and Union Pacific Railroad, is closed to traffic through late fall.
Alternate Route:
Motorists are encouraged to use the 77th Avenue eastbound ramps, 75th Street (WIS 50), 88th Avenue(CTH H), 52nd Street (WIS 158) and Green Bay Road(WIS 31) to get around the closure.
Daytime Full Closure of 77th Avenue Westbound Ramps PDF
70th Avenue to Reopen, 69th Avenue to Close
Wednesday, November 9:
• 70th Avenue, between WIS 50 (75th Street) and just north of 78th Street, is scheduled to reopen to traffic on Wednesday, November 9 by 8 p.m.
• 69th Avenue, between WIS 50 (75th Street) and 75th Place, is scheduled to close to traffic on Wednesday, November 9 by 11:59 p.m., through late 2022.
70th Avenue to Reopen, 69th Avenue to Close PDF
77th Eastbound Ramps Closure
Sunday, October 16 thru Wednesday, October 19:
• 77th Avenue eastbound ramps, are scheduled to close to traffic beginning Sunday, October 16 at 7 p.m. to Wednesday, October 19 at 11:59 p.m., while crews work to perform bridge overlay work.
•As part of a separate project, County Highway K (60th Street),between 94th Court and Union Pacific Railroad, is closed to traffic through late fall.
Alternate Routes:
Traffic entering 77th Avenue:
→Motorists are encouraged to use 88th Avenue, WIS 158,WIS 31 and the WIS 50 westbound exit ramp to 77th Avenue to get around the eastbound exit ramp closure.
Traffic exiting 77th Avenue:
→Motorists are encouraged to use the 77th Avenue west bound entrance ramp to WIS 50, 88th Avenue, WIS 158, and WIS 31to get around the eastbound entrance ramp closure.
77th Eastbound Ramps Closure PDF
WIS 50 Eastbound Closure & 77th Eastbound Ramp Closure
Tuesday Overnight, October 11:
• WIS 50 eastbound, between 88th Avenue (County Highway H) and WIS 31 (Green Bay Road), is scheduled to close overnight from Tuesday evening at midnight to Wednesday, October 12 at 6 a.m., while crews work to perform bridge overlay work.
• 77th Avenue eastbound ramps are scheduled to close overnight from Tuesday evening at midnight to Wednesday, October 12 at 6 a.m.
Alternate Route:
Motorists are encouraged to use 88th Avenue, WIS 158, and WIS 31 to get around the eastbound full closure.
WIS 50 Eastbound Closure & 77th Eastbound Ramp Closure PDF
60th Avenue Storm Sewer Crossing
Monday, October 10 and Tuesday, October 11:
• 60th Avenue, between WIS 50 and 77th Street is scheduled to close to traffic from 9 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Northbound local access will be available up to 77th Street.
• Southbound local access will be available up to WIS 50 (75th Street).
Alternate Route:
Motorists are encouraged to utilize WIS 50 (75th Street), WIS 31 (Green Bay Road), 85th Street and 60th Avenue to get around the overnight closures.
Access to residences and businesses will be maintained throughout construction.
60th Avenue Storm Sewer Crossing PDF
52nd Avenue to Close Long-Term
Beginning Wednesday, October 5, by 5 a.m.
• Traffic on 52nd Avenue, between 51st Avenue and Harrison Road, is scheduled to close to traffic through late 2022.
• 64th Avenue south of WIS 50 is scheduled to close to traffic through late 2022.
The following side streets are scheduled to reopen Wednesday, October 5, by 5 a.m.
→70th Avenue north of WIS 50
→49th Avenue south of WIS 50
→76th Street east of WIS 31
Access to businesses and residences will be maintained throughout construction.
52nd Avenue to Close Long-Term
WIS 50 Traffic Switch
Tuesday, September 20 by 6:00 a.m.
• Traffic on WIS 50 (75th Street) between 43rd and 60th avenues is scheduled to be shifted north, onto the newly constructed westbound lanes.
• 45th Avenue between WIS 50 and 74th Place is scheduled to reopen to traffic.
• 57th Avenue just north of WIS 50 is scheduled to reopen to traffic.
• 45th Avenue between WIS 50 and 76th Street is scheduled to close to traffic through late fall.
• Northbound traffic on 60th Avenue between 77th Street and 73rd Street is scheduled to be shifted east, onto the newly constructed northbound lanes, by 6 a.m., while crews work to reconstruct the median.
Access to residences and businesses will be maintained throughout construction.
WIS 50 Traffic Switch PDF
WIS 50 Traffic Switch
Thursday, September 1 by 6:00 a.m.:
• Westbound traffic on WIS 50 (75th Street) between 60th and 88th avenues (CTH H) is scheduled to be shifted north, onto the newly constructed westbound lanes.
• Eastbound traffic on WIS 50 (75th Street) between 73rd and 64th avenues is scheduled to be shifted north, onto the newly constructed westbound lanes, while crews work to construct the future eastbound lanes.
• WIS 50 westbound exit and entrance ramps at 77th Avenue, are scheduled to reopen to traffic.
• 70th Avenue between 78th Street and WIS 50 (75th Street) is scheduled
to close to traffic, through fall, while crews work to reconstruct the intersection.
WIS 50 Traffic Switch PDF
WIS 50 to Close Overnight
Friday, August 26:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 52nd Avenue.
• Westbound local access will be available up to 47th Avenue.
Alternate Route:
Motorists are encouraged to use WIS 31, WIS 158 (52nd Street), and 39th Avenue to get around the closure.
WIS 50 to Close Overnight PDF
WIS50 to Close Overnight
Tuesday, August 23 and Wednesday, August 24:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 52nd Avenue.
• Westbound local access will be available up to 47th Avenue.
Alternate Route:
Motorists are encouraged to use WIS 31, WIS 158 (52nd Street), and 39th Avenue to get around the closure.
WIS 50 to Close Overnight PDF
WIS 31 (Green Bay Road) Traffic Switch
Wednesday, August 3:
• Traffic on WIS 31 (Green Bay Road), from 78th Street to 67th Street is scheduled to be shifted west onto the current median, while crews work to reconstruct the northbound lanes.
• 74th and 76th streets, east of WIS 31, are scheduled to close to traffic while crews work to reconstruct the intersections.
Bi-directional traffic on WIS 31 (Green Bay Road) will be maintained throughout construction. Motorists should be aware that dedicated turn lanes and median openings in various locations throughout the project are scheduled to close to traffic while intersections are under construction.
WIS 31 (Green Bay Road) Traffic Switch PDF
WIS 50 to Close Overnight
Monday, July 18:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 52nd Avenue.
• Westbound local access will be available up to 47th Avenue.
Alternate Route:
Motorists are encouraged to use WIS 31, WIS 158 (52nd Street), and 39th Avenue to get around the closure.
WIS 50 to Close Overnight PDF
60th Avenue to Reopen, 57th Avenue to Close
Saturday, June 25:
• 60th Avenue, between WIS 50 (75th Street) and 73rd Street, is scheduled to reopen to traffic by 6 a.m.
Monday, June 27:
• 57th Avenue, just north of WIS 50 (75th Street), is scheduled to close to traffic, by 6 a.m., through late summer, while crews work to reconstruct the intersection.
60TH AVENUE TO REOPEN, 57TH AVENUE TO CLOSE
WIS 50 to Close Overnight
Tuesday, June 14 and Wednesday, June 15:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 57th Avenue.
• Westbound local access will be available up to 52nd Avenue.
Thursday, June 16 and Friday, June 17:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 52nd Avenue.
• Westbound local access will be available up to 47th Avenue.
Alternate Route:
Motorists are encouraged to use WIS 31, WIS 158 (52nd Street), and 39th Avenue to get around the closure.
WIS 50 to Close Overnight
WIS 50 to Close Overnight
Tuesday, June 7:
• WIS 50 eastbound, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
Wednesday, June 8 - Friday, June 10:
• WIS 50, between WIS 31 (Green Bay Road) and 39th Avenue is scheduled to close to traffic from 10 p.m. to 6 a.m., while crews work to install storm sewer crossings.
• Eastbound local access will be available up to 57th Avenue.
• Westbound local access will be available up to 52nd Avenue.
Alternate Route:
Motorists are encouraged to use WIS 31, WIS 158 (52nd Street), and 39th Avenue to get around the closure.
WIS 50 to Close Overnight
Overnight Westbound WIS 50 Closures
Monday, May 9 and Tuesday, May 10:
• Westbound WIS 50, between WIS 31 (Green Bay Road) and 88th Avenue (County Highway H), is scheduled to be closed overnight from 9 p.m. to 6 a.m., for bridge girder installation.
• As part of a separate project, County Highway K (60th Street), between 94th Court and Union Pacific Railroad, is scheduled to be closed to traffic beginning Tuesday, May 10.
Alternate Route:
→ Motorists are encouraged to use WIS 31, WIS 158, and 88th Avenue to get around the closure.
Please note that all work is weather dependent and subject to change.
Overnight Westbound WIS 50 Closures
WIS 50 Traffic Switch
Week of December 13:
• Traffic on WIS 50 from 118th Avenue to 88th Avenue, is scheduled to open to three lanes in each direction.
• Traffic on on 104th, 94th, and 88th avenues will be shifted to the outside lanes, with one lane of traffic in each direction.
• Traffic on WIS 50, from just east of 88th Avenue to 70th Avenue, is scheduled to be shifted south to the newly constructed eastbound lanes with two lanes of traffic maintained in each direction, while crews complete the westbound bridge structures.
• Westbound WIS 50 exit and entrance ramps at 77th Avenue are scheduled to close to traffic through late 2022.
Access to businesses and residences will be maintained throughout construction.
WIS 50 Traffic Switch PDF
WIS 50 Traffic Switch
Thursday, December 2nd:
Traffic on eastbound WIS 50 from 118th Avenue to 88th Avenue (CTH H), is scheduled to be shifted to the inside lanes by 6 a.m., while crews complete the outside lanes. Two lanes of traffic will be maintained.
Friday, December 3rd:
Traffic on westbound WIS 50 from 118th Avenue to 88th Avenue (CTH H), is scheduled to be shifted to the inside lanes by 6 a.m., while crews complete the outside lanes. Two lanes of traffic will be maintained.
Access to businesses and residences will be maintained throughout construction.
WIS 50 Traffic Switch PDF
Overnight Eastbound WIS 50 Closures
Monday, October 11 and Tuesday, October 12:
Eastbound WIS 50, between 104th Avenue and 70th Avenue is scheduled to be closed overnight from 9 p.m. to 6 a.m., for bridge demolition.
Alternate Route: Motorists are encouraged to use 104th Avenue, 52nd Street (WIS 158), and Green Bay Road (WIS 31) to get around the closure.
Access to residences and businesses will be maintained throughout construction.
Overnight Eastbound WIS Closures PDF
WIS 50 Traffic Switch
Friday, September 24th:
Eastbound WIS 50 between 104th Avenue and 70th Avenue, is scheduled to close to traffic overnight from 10 p.m. to 6 a.m., as crews perform a traffic switch.
Saturday, September 25th:
Traffic on eastbound WIS 50 from just east of 88th Avenue to 70th Avenue is scheduled to be shifted south to the newly constructed outside lanes, by 6 a.m. for crews to begin construction on the inside lanes.
Access to businesses and residences will be maintained throughout construction.
WIS 50 Traffic Switch Map
88th Avenue (County H) to Close Long-Term
Monday, September 20:
88th Avenue (County H) from WIS 50 to 70th Street is scheduled to close to thru traffic, for approximately one month, while crews work to reconstruct the roadway, by 6 a.m.
Alternate Route: Motorists are encouraged to utilize 75th Street (WIS 50), Green Bay Road (WIS 31), and 52nd Street (WIS 158) to get around this closure.
Access to residences and businesses will be maintained throughout construction.
88th Avenue (County H) Detour Map
WIS 50 Traffic Switch
Saturday, September 11:
• Traffic on eastbound WIS 50 from 118th Avenue to just east of 88th Avenue, is scheduled to be shifted to the newly constructed outside lanes, while crews work to construct the inside lanes, by 6 a.m.
• 99th Avenue from WIS 50 to 76th Street is scheduled to reopen to traffic, with right-in, right-out movements, by 6 a.m.
• 91st Avenue from WIS 50 to 76th Street is scheduled to reopen to traffic, with right-in, right-out movements, by 6 a.m.
Sunday September 12:
• Traffic on westbound WIS 50 from just east of 88th Avenue to 117th Avenue, is scheduled to be shifted to the newly constructed outside lanes, while crews work to construct the inside lanes, by 6 a.m.
• 96th Avenue from WIS 50 to 74th Street is scheduled to reopen to traffic, with right-in, right-out movements, by 6 a.m.
Access to residences and businesses will be maintained throughout construction.
WIS 50 Traffic Switch Map
88th Avenue (County H) Traffic Switch
Wednesday August 18:
• Traffic on 88th Avenue from Prairie Ridge Boulevard to just north of 74th Street, is scheduled to be shifted east onto the current northbound lanes, while crews work to construct the future southbound lanes, by noon.
Monday, August 23:
• 74th Street access west of 88th Avenue is scheduled to be closed long-term, by 6 a.m.
• 76th Street access west of 88th Avenue is scheduled to be closed long-term, by 6 a.m.
Alternate Route for 74th Street: Motorists are encouraged to utilize 75th Street (WIS 50), 91st Avenue, and 74th Street to get around this closure.
Alternate Route for 76th Street: Motorists are encouraged to utilize 88th Avenue (County H), Prairie Ridge Boulevard, 91st Street and 76th Street to get around this closure.
88th Avenue (County H) Traffic Switch Map
Traffic Changes along WIS 50
Saturday, August 14:
• 94th Avenue from 74th Street to St. Catherine’s Drive is scheduled to reopen to traffic by 6 a.m.
Monday, August 16:
• 91st Avenue just north of WIS 50 is scheduled to reopen to traffic by 6 a.m.
• 99th Avenue just north of WIS 50 is scheduled to reopen to traffic by 6 a.m.
• 96th Avenue from WIS 50 to 74th Street is scheduled to close to traffic by 6 a.m.
• 99th Avenue from WIS 50 to 76th Street is scheduled to close to traffic by 6 a.m.
• 91st Avenue from WIS 50 to 76th Street is scheduled to close to traffic by 6 a.m.
Traffic Changes along WIS 50 Map
Overnight Eastbound WIS 50 Closures
CANCELED
Wednesday August 11 and Thursday August 12:
Eastbound WIS 50, between 88th Avenue (County H) and 70th Avenue is scheduled to be closed overnight from 10 p.m. to 6 a.m., for barrier wall work.
Alternate Route: Motorists are encouraged to use 88th Avenue (County H), 52nd Street (WIS 158), and Green Bay Road (WIS 31) to get around the closure.
Access to residences and businesses will be maintained throughout construction.
Overnight Eastbound WI Closures Detour Map
109th Avenue to Open
Monday, July 26:
•
The newly constructed 109th Avenue, is scheduled to open to traffic by 5 a.m.
• 109th Avenue north of WIS 50 will serve as a new shared driveway entrance to Riverwood Apartments, Journey Church, and Aurora Medical Center.
• 109th Avenue south of WIS 50 will serve as a new driveway entrance to Lynch Chevrolet and development to the south.
• Motorists wishing to visit Aurora Medical Center, should be advised that the entrance via 109th Avenue will be a one-way only entrance throughout the duration of construction of 109th Avenue.
109th Avenue to Open Map
Overnight Storm Sewer Work Crossing WIS 50
Monday, July 12:
WIS 50, between 118th Avenue and WIS 31 (Green Bay Road) is scheduled to have eastbound and westbound overnight closures for approximately one week (10 p.m. to 6 a.m.), for storm sewer crossings and girder installation. Eastbound and westbound WIS 50 will not be closed simultaneously during this work.
– During eastbound full closures, westbound traffic on WIS 50 will be reduced to one lane.
– During westbound full closures, eastbound traffic on WIS 50 will be reduced to one lane.
Crews are scheduled to begin with westbound storm sewer crossings, following completion, crews will begin with eastbound storm sewer crossings.
Alternate Route: Motorists are encouraged to use WIS 31, WIS 158, 118th Avenue and East Frontage Road to get around the closure.
Access to residences and businesses will be maintained throughout construction. Businesses and residents should also be aware that there will be noise and dust associated with this work, steps will be taken to minimize these effects.
Overnight Storm Sewer Work Crossing WIS 50 detour map
77th Street to Close
Monday, July 12:
77th Street from 104th Avenue to just west of 105th Avenue is scheduled to close for approximately five days while crews perform storm sewer operations.
Alternate Route:
Motorists are encouraged to utilize 104th Avenue, 79th Street, and 105th Avenue to get around this closure.
Access to residences will be maintained throughout construction.
77th Street to Close detour map
88th Avenue (County H) to Close Overnight
Wednesday, June 30:
88th Avenue (County H) from WIS 50 (75th Street) to Prairie Ridge Boulevard is scheduled to close overnight, between 10 p.m. and 6 a.m., for storm sewer operations.
Alternate Route: Motorists are encouraged to use 104th Avenue and Prairie Ridge Boulevard to get around this closure. Access to residences and businesses will be maintained during this closure.
88th Street to Close Overnight Detour Map
UPDATE: June 22 - The 77th Street closure that was scheduled to begin on Wednesday, June 30th, has been canceled due to contractor coordination.
77th Street to Close Long Term
Wednesday, June 30:
77th Street from 104th Avenue to just west of 105th Avenue is scheduled to close for approximately five days while crews perform storm sewer operations.
Alternate Route: Motorists are encouraged to utilize 104th Avenue, 79th Street, and 105th Avenue to get around this closure.
Access to residences will be maintained throughout construction.
77th Street to Close Long Term Detour Map
99th Avenue to Close Overnight
Thursday, June 3:
Beginning Monday June 7, 99th Avenue from WIS 50 (75th Street) to 76th Street is scheduled to close overnight, between 10 p.m. and 6 a.m., for approximately two nights for storm sewer crossings.
Alternate Route: Motorists are encouraged to utilize WIS 50 (75th Street), 104th Avenue, and 77th/76th Street to get around this closure.
Access to residences and businesses will be maintained during this closure.
99th Avenue to Close Overnight Detour Map
104th Avenue to Close Overnight
Thursday, May 27:
Beginning Tuesday, June 1, 104th Avenue from WIS 50 (75th Street) to 60th Street (County K) is scheduled to close nightly for approximately one week, from 10 p.m. to 6 a.m. for storm sewer crossings.
Alternate Route:
Motorists are encouraged to utilize WIS 50 (75th Street), East Frontage Road (118th Avenue), 60th Street (County K), and 88th Avenue (County H) to get around this closure.
104th Avenue to Close Overnight Detour Map
Temporary Stop Sign at the intersection of 104th Avenue and 77th Street
Thursday, May 20:
As a part of the Wisconsin Department of Transportation reconstruction at 104th Avenue and 77th Street for the STH 50 project, the contractor will be adding a temporary stop sign at the intersection of 104th Avenue and 77th Street. This will be installed next week and stay until the construction of 104th Avenue is complete. When the road construction in complete this fall, the intersection will go back to a thru road for 104th Avenue.
Eastbound WIS 50 to Close Overnight
Monday, May 10:
Eastbound WIS 50 (75th Street) from 88th Avenue (County H) to 70th Avenue is scheduled to close overnight on Tuesday, May 11 from 11 p.m. to 6 a.m. for crane mobilization.
Alternate Route: Motorists are encouraged to utilize 88th Avenue (County H), WIS 158 (52nd Street), and WIS 31 (Green Bay Road) to get around this single night closure.
Access to residences and businesses will be maintained during this closure.
Eastbound WIS 50 to Close Overnight Map
99th Avenue to Close Long-Term
Friday, April 23:
• 99th Avenue access north of WIS 50 is scheduled to close Wednesday, April 28 by 6 a.m. through early summer.
• Access to residences and businesses will be maintained by using the 104th Avenue and 74th Street intersection.
99th Avenue Closure Map
WIS 50 Traffic Switch
Tuesday, April 13:
• Traffic on WIS 50 from 117th Avenue to WIS 50 Frontage Road is scheduled to begin to be shifted to the inside lanes
• Traffic on County Highway H (88th Avenue) is scheduled to be shifted west onto the current southbound lanes with
one lane of traffic in each direction
• Traffic on 104th Avenue is scheduled to be shifted west onto the current southbound lanes with one lane of traffic
in each direction
• 74th Street access east of 104th Avenue is scheduled to close long-term
• 91st Avenue north of WIS 50 is scheduled to close long-term
• 94th Avenue is scheduled to close to traffic from 74th Street to St. Catherine’s Drive for approximately two months
• WIS 50 eastbound exit and entrance ramps at 77th Avenue, are scheduled to close to traffic through summer
• Access to residences and businesses will be maintained throughout construction.
WIS 50 Traffic Switch Map
94th Avenue from 74th Street to St. Catherin's Drive to close long-term
Tuesday, April 13:
• 94th Avenue is scheduled to close to traffic from 74th Street to St. Catherine’s Drive for approximately two months, by 6 a.m.
• Access will be maintained to residents located on 74th Place
Alternate Route:
Motorists are encouraged to utilize WIS 50, 96th Avenue, 104th Avenue, Prairie Ridge Boulevard, and 88th Avenue (County H) to get around this closure.
Access to residences and businesses will be maintained throughout construction.
94th Ave. from 74th St. to St. Catherine's Dr. Closure Map
Overnight Storm Sewer Work Crossing WIS 50
Monday, March 22:
• WIS 50, between 118th Avenue and WIS 31 (Green Bay Road) is scheduled to have eastbound and westbound overnight closures for approximately two weeks (11 p.m. to 6 a.m.), for storm sewer crossings. Eastbound and westbound WIS 50 will not be closed simultaneously during storm sewer crossing work.
– During eastbound full closures, westbound traffic on WIS 50 will be reduced to one lane.
– During westbound full closures, eastbound traffic on WIS 50 will be reduced to one lane.
• Crews are scheduled to begin with eastbound storm sewer crossings, following completion, crews will begin with westbound storm sewer crossings.
Alternate Route:
→ Motorists are encouraged to use WIS 31, WIS 158, 118th Avenue and East Frontage Road to get around the closure.
Access to residences and businesses will be maintained throughout construction. Businesses and residents should also be aware that there will be noise and dust associated with this work, steps will be taken to minimize these effects.
Storm Sewer Alternative Route Map
WIS 50 Traffic Switch
Wednesday, March 10:
• Eastbound traffic on WIS 50 from 117th Avenue to WIS 50 Frontage Road is scheduled to be shifted to the outside lanes, by 6 a.m.
• Traffic on County Highway H (88th Avenue) is scheduled to be shifted east onto the current northbound lanes, with one lane of traffic in each direction, by 6 a.m.
Friday, March 12:
• Westbound traffic on WIS 50 from WIS 50 Frontage Road to 117th Avenue is scheduled to be shifted to the outside lanes, by 6 a.m.
• Traffic on 104th Avenue is scheduled to be reduced to one lane in each direction through late fall 2021, by 6 a.m.
Traffic Switch Map
WIS 50 Frontage Road (South) to Close for Long-Term
Monday, March 8:
• WIS 50 Frontage Road (south), is scheduled to close to traffic long-term by 6 a.m. through summer 2021.
• Access to residences and businesses will be maintained from WIS 50 Frontage Road, north of WIS 50.
Alternate route:
• Motorists traveling eastbound are encouraged to use WIS 50 and WIS 50 Frontage Road, north of WIS 50 to get around the closure.
Please note that all work is weather dependent and subject to change.
Frontage Road Closure and Alternative Route Map
Village of Pleasant Prairie | All Rights Reserved | Powered by
CivicLive | © 2024 Civiclive.