 The Village is investing in important improvements to expand and strengthen the public water system along 122nd Street. This project includes installing new water main infrastructure to improve system reliability, increase capacity, enhance fire protection, and provide municipal water service to areas that previously did not have access. Most of the water main will be installed by directional drilling within the south ditch of 122nd Street, with the exception of two crossings: the Des Plaines River, where the alignment will shift south beyond the bridge, and the Canadian Pacific Railroad, which will be installed using the jack and bore method. To complete this work safely, 122nd Street will be closed to thru traffic during construction. However, local access for residents and emergency vehicles will be maintained, and construction activities will be coordinated to minimize disruptions as much as possible.

Project Area Map:
122nd Street Water Main Extension Overview Map
















Schedule: 
Works is anticipated to begin with the railroad crossing in November 2025 pending final approval by the Canadian Pacific Railroad. The Contractor currently anticipates completing the project in Spring 2026.

Contact: Tim Kuligoski, Village Construction Supervisor
Phone: (262) 948-894
Email: [email protected]
Village of Pleasant Prairie | All Rights Reserved | Powered by CivicLive | © 2025 Civiclive.